Controls that are required to be satisfied before the locking on a routeThe path along a section of track between one Signal and the next, along which an authorised movement is to be made. or a
section of a routeThe path along a section of track between one Signal and the next, along which an authorised movement is to be made. is released. Controls on conflicting routes are released by
the train clearing track sections. If required, controls on opposing routes are
released by the train timed to a stand on an appropriate track sectionA portion of railway track having fixed boundaries and for which the Train Detection System provides information on its state of occupancy to the Signalling Sys.... See
also Route LockingA form of Interlocking which maintains the locking associated with a Route in use until after the train has passed clear of the equipment being Locked (for exam...