A plan, produced at an early stage in the development of a project, showing
operating requirements and infrastructure features, including the track
layout, stations, Level Crossings. It is used as a basis for producing the
Scheme PlanA longitudinal scaled or dimensioned track layout plan that is produced to depict new or altered Signalling Systems..