Unworked Trailing PointsPoints which join two converging Routes. which return under spring load to the NORMAL
position after the passage of a train in the Trailing Direction. They may be
used as Catch PointsPoints provided to derail vehicles running back on rising gradients. The points may only be Unworked if traffic is in one direction only..